Coronet 86th St

The “bike lane” on 86th street from Davies Rd to Coronet Rd is in extremely poor shape, with several potholes and some bus infrastructure intruding.

Coronet Industrial shared path along 86St
  • Start of “Bike Lane” on Davies Rd and 86th St Northbound
    Sidewalk is of standard width

Issues

  • Sidewalk is very cracked and heaved
  • Pathway is often “standard” sidewalk width, not wider “shared path” style
  • Bus infrastructure intrudes in to pathway
  • Curb and sidewalk are separated enough to swallow a bike tire (dangerous at speed)
  • At north end, curb is too low to protect path users from wayward cars
  • In general, width and obstacles often appear to violate recommendations in Complete Streets Design and Construction Standard (2023) (v05) (Pg 51, 60, 76-81, etc)

Communications

Aug 5th 2024: Submitted request as issue #8026199567
Aug 9th: Spoke with Maintenance Dept employee
Sept 4th: Confirmed in correspondence with CoE rep that “part of the contracted rehabilitation work is to create an asphalt shared use path on 86 Street.”


Outcome

The road from ~51st Ave to ~Wagner is scheduled for a complete rebuild, (either late this year or next) which includes the roadway and sidewalks. The new specs will be used for shared-path infrastructure (which is wider than the previous specs)

The City of Edmonton has a page specifically for this redevelopment project.